Power-up sequence – Intermec 6710 User Manual

Page 199

Advertising
background image

SECTION 6

"

Indicator Lights

6710 Access Point User’s Guide 6-7

Power-Up Sequence

When you power on the access point, it performs a power-up

sequence that does the following:

"

Tests the indicator lights.

"

Tests the functional circuits.

"

Determines the operational status.

"

Determines the boot sequence.

You can monitor the power-up sequence through the

indicator lights. During power-up the lights operate in this

order:

1. LINK indicator light turns ON and stays ON.
2. STATUS, MODE, R-LINK, W-LINK, NIC1, and NIC2

lights blink three times to indicate they are

operational.

3. After the previous lights stop blinking, W-LINK light

blinks three more times.

4. About eight seconds after W-LINK stops blinking,

R-WINK, W-LINK, NIC1 and NIC2 lights either turn

ON or stay OFF to indicate the DIAG port’s baud rate

(see page 6-6).

5. MODE light blinks constantly to indicate it is in

network mode, the normal operating condition.

After the access point completes its boot sequence, it enters

its normal operating mode. During normal operation the

STATUS indicator light is OFF.

Advertising