Siemens Simantic Net NCM for Industrial Ethernet S7 User Manual

Page 98

Advertising
background image

Configuring Communication Connections

98

SIMATIC NET NCM S7 for Industrial Ethernet

C79000-G8976-C129–06

Table 4-3

Actions That Can Cause Changes to Configured Connections, continued

Action

How to Establish the Connection

Again

Consequences for the

Connections

Deleting a remote station.

The connections of the stations
in the project to remote stations
remain without assignment in
the connection table. In the
“Overview” tab of the Properties
dialog, the connections are
identified with “!”.

Reassign a remote station (or even a
local station) using the menu option Edit

"

Connection Partner....

Changing the subnet
assignment of the CP.

The connections that were
assigned via the CP remain
without an assignment in the
connection table. In the
“Overview” tab of the Properties
dialog, the connections are
identified with “!”.

Reassign the connections using the
menu option Edit

"

Connection

Partner... or in the “Addresses” tab of
the properties dialog for the connection.

Display (Example)

The status of connections is displayed in the “Properties ISO Transport
Connection” dialog in the “Overview” tab.

Figure 4-5

Status of the Connections in the “Overview” Tab (Example of ISO Transport Connections)

Notice

If you replace one CP with another, this must provide at least the same services
and have at least the same version.

Advertising