Aker – Liebherr BF1051 User Manual

Page 25

Advertising
background image

23

BFI/BF1051 / BGEN/es 2956

A delight in freshness

I

CE

M

AKER

Water Connection

- Figure 22

Please read the first three points of the safety
instructions and warnings before connecting the
appliance to the main water supply.

• The water pressure must be between 21.8-87.0

psi (1.5-6 bar).

• Use a 1/4" OD copper line to connect the water

supply to the solenoid valve.

This is not

supplied with the refrigerator (Figure 22).

• A shut-off valve, such as the saddle valve

illustration here, must be installed between the
hose line and the main water supply so the
water supply can be stopped if necessary.

Do not install the shut-off valve behind the
refrigeration unit.

Figure 22

• If you have hard water, we recommend you install

a water softener. Also, a filter must be installed if
the water contains solids such as sand.

• All equipment and devices used to supply the

water to the appliance must comply with the
current regulations for your geographical area.

BGEN_7082248_0929_Install_3Lang.qxd 10/21/2004 7:56 AM Page 23

Advertising
This manual is related to the following products: