7.3

Prompt (Pop-Up) Windows

The prompt window is displayed during the operation of the system to alert the user to certain condi-

tions and / or to require user confirmation of a command.

7.4

Dynamic Energy Flow Chart and UPS Help Screen

This screen displays a mimic diagram of the UPS that includes energy flow and status of isolation and

transfer switches. Press the “Help” key to activate this screen. Press again to toggle between this

screen and the main screen.

Figure 34 Help screen

Table 23

Prompt windows, meanings

Prompt

Meaning

Transfer with interrupt, please confirm or cancel

Inverter and Bypass supplies are not synchronised and

any load transfer between the supplies will cause a brief

load interruption.

The load is too high to be transferred with interrupt

The total load must be less than the capacity of one unit

to allow a parallel system to perform an interrupted

transfer from bypass to inverter.

This Operation Leads to Output Shutdown, Confirm or

Cancel

No alternative supply is available and any Inverter Off

operation will cause the load to be de-energised.

This operation leads to inverter overload, confirm or

cancel

The turn-off this inverter will lead to the overload of

remaining inverter(s) in a parallel system.

Turn on more UPS to carry current load

The number of paralleled inverters already turned on is

insufficient to carry the existing load.

Battery will be depleted, confirm

Battery Capacity test discharges the battery 100%

System self test finished - everything is ok.

No action required

System self test finished - Please check the current

warnings.

Check “Current Records” window

Enter control password

Required for Battery or UPS test (default = 12345)

Battery Self Test aborted, condition not met

Battery self-test condition is not enough. User should

check whether battery state is boost charging and

whether load level is greater than 20 percent.

Battery Refresh Charge aborted, condition not met

Boost charging condition is not enough, such as (No

battery, charger has failed, etc.).

F2

F3

F4

HELP

F1

Help information

Select the current record window

Press help key back to main menu

Select the previous menu item