Way valve, Pumping down – LG LA120CPI User Manual

Page 56

Advertising
background image

56 Room Air Conditioner

Troubleshooting Guide

Pumping Down

3-way Valve

• Procedure

(1) Confirm that both liquid side and gas side

valves are set to the open position.
– Remove the valve stem caps and confirm that

the valve stems are in the raised position.

– Be sure to use a hexagonal wrench to operate

the valve stems.

(2) Operate the unit for 10 to 15 minutes.

(3) Stop operation and wait for 3 minutes, then

connect the charge set to the service port of
the Gas side valve.
– Connect the charge hose to the service port.

(4) Air purging of the charge hose.

– Open the low-pressure valve on the charge set

slightly to air purge from the charge hose.

(5) Set the liquid side valve to the closed position.

(6) Operate the air conditioner in cooling mode

and stop it when the gauge indicates
1kg/cm

2

g.

(7) Immediately set the Gas side valve to the

closed position.
– Do this quickly so that the gauge ends up indi-

cating 3 to 5kg/cm

2

g.

(8) Disconnect the charge set, and mount the

Liquid side and Gas side valve’s stem nuts
and the service port nut.
– Use torque wrench to tighten the service port

nut to a torque of 1.8 kg.m.

– Be sure to check for gas leakage.

Lo

Closed

Purge the air

Outdoor unit

Indoor unit

Liquid side

Gas side

CLOSE

Open

3-Way
valve

3-Way
valve

CLOSE

Advertising
This manual is related to the following products: