Installing and operating passport arn routers 1-22, Db-60 cable db-25 connector ports – Nortel Networks Passport ARN Routers User Manual

Page 46

Advertising
background image

Installing and Operating Passport ARN Routers

1-22

114200-E Rev 00

To connect X.25 PAD services:

1.

Position the X.25 breakout box above the ARN in one of the following
ways:

Attach the rubber feet that came in the shipping container to the four
raised areas on the bottom of the breakout box chassis; then, place the box
on top of the ARN (

Figure 1-18

).

Using the screw holes on the sides of the breakout box, install the box
above the ARN in a standard equipment rack. For information about
rack-mounting the ARN, see “Rack-Mounting the ARN” on

page 1-6

.

2.

Connect the DB-60 cable on the breakout box to the X.25 PAD connector
on the installed module (

Figure 1-18

).

Figure 1-18.

Connecting a Breakout Box to the X.25 PAD Interface

3.

Connect the appropriate WAN cabling to each of the eight DB-25
interfaces on the breakout box that you will use.

For information on cables available from Nortel Networks, see the Cable
Guide
.

ARN0088A

COM3

COM4

COM5

Serial

COM

TX

RX

RLSD

Run

Boot

Fail

Pwr

RPS

Fan

Base

Adapter1

Adapter2

Expansion

DCM

PCMCIA

Advanced Remote Node

RLSD3

RLSD4

RLSD5

1

2

Serial

Tx

Rx

Cl

Tx

Rx

Cl

10BaseT

AUI

Ethernet 1

10BaseT

AUI

Ethernet 2

X.25 PAD

DB-60 cable

DB-25 connector ports

Advertising