7.7 - Instructions for Stack Replacement

Note: All power sources must be removed and a waiting period of at

least 15 minutes must be observed before initiating any repairs to

the unit(s) because DC voltage may still be present immediately after

turning off power to the unit.

Note: It is good practice to disassemble and reassemble one stack at a

time so you can have an assembled and wired stack in the unit as a

reference.

Note: Toshiba recommends that the order include the SCR with the heat-

sink assembly at a minimum. Only an experienced technician should

attempt to replace the SCRs.

Tools:

• Phillips screwdriver

• 3/8” 12 point socket set

• 2 9/16” wrenches

• ½” wrench

• AC/DC Multimeter

• JKSSS+ manual (refer to drawings in this section)

Procedure:

1. Verify that no DC or AC voltage is present on any of the power compo-

nents.

2. Disconnect all four wires connected to TB1 positions 1-3 on the tempera-

ture CT board.

3. Disconnect the 4 red transformer wires on each of the gate drive boards.

These would be TB1, positions 3 and 5 for each gate drive board. Typically,

the 2300V unit will have only 4 wires per phase to disconnect, a 4160V unit

will have 8 wires per phase, and a 6000 - 7200V unit will have 12 wires per

phase. (Note: the 7200V/600A unit will also have 24 wires.)

4. Use the 9/16 wrench and carefully unbolt all of the line and load power con-

nections attached to the heat sinks. Note: If the unit is a 6000 - 7200V, re-

move the power strap connecting one side of the stack to the stack directly

below it.

5. Before removing the fiber optic wiring, make a note of the label on the

fiber cable to ensure they are placed exactly in the same socket they were

removed from. Now remove all fiber optic connectors on the stack. Gently

push on the connector tab and pull with a gentle left-to-right motion on the

connector in the direction away from the fiber optic device. Two connectors

will be found per gate drive board and one duplex connector will be found

on the small Temp/CT board on top. Caution: Do not touch the tip of the

connectors or contaminate the connection sockets with any dust or foreign

material.

6. Remove the wires from the Temp/CT board terminal block (3 screws).

7. Use a 9/16” socket with a 6” extension to remove the lower bolt that

routes through the front face of the heat sink and into the isolation standoff

mounted to the white panel. Then carefully hold the heat sink in place with

one hand and remove the top bolt from the heat sink.

8. Ensure the fiber optic connectors and all wires are positioned out of the

way, and then the heat sink can be gently removed from the unit.

DANGER

HAZARDOUS VOLTAGE

Disconnect all power supplying this equipment prior
to working on it.

Failure to follow this instruction will result in death
or serious injury.