Refrigerant cycle diagram, T1 p – Toshiba RAS-10SAX User Manual

Page 10

Advertising
background image

– 10 –

5. REFRIGERANT CYCLE DIAGRAM

RAS-10SK-E / RAS-10SA-E

RAS-10SKX / RAS-10SAX

Note :

• Measure the heat exchanger temperature at the center of U-bend. (By means of TC sensor.)

Surface temp. of heat

exchanger interchanging

pipe T1 (°C)

10SK-E

10SKX

13.0

18.0

2.0

Standard pressure

P

(kg/cm²G)

10SK-E

10SKX

5.0

6.5

4.0

Outdoor

35/24

43/26

21/15

Cooling

50Hz

Standard

High temperature

Low temperature

Ambient temp.

conditions DB/WB

(°C)

Fan speed

(indoor)

High

High

Low

Indoor

27/19

32/23

21/15

Fig. 5-1

Table 5-1

Evaporator

Indoor unit

Cross flow fan

Optional piping kits

RB-P31BFH1 (3m)

RB-P51BFH1 (5m)

RB-P71BFH1 (7m)

Compressor

Accumulator

Condenser

Propeller fan

Outdoor unit

Dryer

Capillary tube

ø1.5x1200

PH102T1-4C

Mark ( ) means check points of Gas Leak

O.D.:9.52mm

O.D.:6.35mm

Cooling

Packed valve

(ø9.52)

Packed valve

(ø6.35)

0.39m
(Connecting pipe)
ø9.52

0.49m
(Connecting pipe)
ø6.35

T1

P

Refrigerant
R-22 0.73kg

Advertising
This manual is related to the following products: