Chapter 14: Projects

Tutorial: Make a New Project

313

2-2. To go back to the PROJECT screen, tap the name of the

operator you want to use.

Step 3: Set up Tests for the Project

A project includes the tests and settings for the tests that are
necessary for a job. If you do not specify settings for a test, the
tester uses the default settings.

For this tutorial, your project will include tests for twisted pair
cable and fiber optic cable. It is not necessary to attach a copper
or fiber module before you set up a test for that module.

To set up a twisted pair test for the project

3-1 On the PROJECT screen, tap NEW TEST.

3-2. If the TEST SETUP screen does not show the DSX-5000

module, tap Module.

If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap DSX-5000.

3-3. On the TEST SETUP screen, select and change the test settings

as necessary for a test on twisted pair cable. For information
about twisted pair test settings, see “Settings for Twisted Pair
Tests” on page 71.

3-4. When you have completed your selections for the twisted pair

cable test, tap SAVE on the TEST SETUP screen.

To set up an fiber loss/length test for the project

3-5. On the PROJECT screen, tap NEW TEST.

3-6. If the TEST SETUP screen does not show a CertiFiber Pro

module, tap Module.

If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap a CertiFIber Pro OTDR module.