Step 3: set up tests for the project, To set up a twisted pair test for the project – Fluke Networks CertiFiber Pro Users Manual User Manual
Page 335

Chapter 14: Projects
Tutorial: Make a New Project
313
2-2. To go back to the PROJECT screen, tap the name of the
operator you want to use.
Step 3: Set up Tests for the Project
A project includes the tests and settings for the tests that are
necessary for a job. If you do not specify settings for a test, the
tester uses the default settings.
For this tutorial, your project will include tests for twisted pair
cable and fiber optic cable. It is not necessary to attach a copper
or fiber module before you set up a test for that module.
To set up a twisted pair test for the project
3-1 On the PROJECT screen, tap NEW TEST.
3-2. If the TEST SETUP screen does not show the DSX-5000
module, tap Module.
If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap DSX-5000.
3-3. On the TEST SETUP screen, select and change the test settings
as necessary for a test on twisted pair cable. For information
about twisted pair test settings, see “Settings for Twisted Pair
Tests” on page 71.
3-4. When you have completed your selections for the twisted pair
cable test, tap SAVE on the TEST SETUP screen.
To set up an fiber loss/length test for the project
3-5. On the PROJECT screen, tap NEW TEST.
3-6. If the TEST SETUP screen does not show a CertiFiber Pro
module, tap Module.
If a module is not attached, the MODULE screen shows.
On the MODULE screen, tap a CertiFIber Pro OTDR module.
(continued)