7. Placing and Installing the Base/Unload Module

PNEG-1708 GSI Modular Tower Dryer

31

Figure 7B Consider overhead clearance for the entire height of the dryer.

4. Ladder brackets are not pre-installed on modules. Consider installation location of ladders and

brackets. Note that ladder brackets will be offset at each catwalk and will not line up in a straight line.

(See Figure 7C.)

IMPORTANT: When planning dryer location, ladders brackets will serve as good reference point for

where catwalks and/or platforms will be placed higher up on the dryer. Be sure to
allow for adequate spacing and clearance between the module dryer wall AND the
platforms and/or catwalks that will be attached higher up and any other equipment
in the area.

Figure 7C Ladder Brackets - Indentify location on each

module and surrounding equipment considerations.