Venturi, Stiffener splice, Lifting and stacking the modules – Grain Systems PNEG-1708 User Manual

Page 63

Advertising
background image

10. Lifting and Stacking the Modules

PNEG-1708 GSI Modular Tower Dryer

63

Venturi

Figure 10Q

Stiffener Splice

Place stiffener splice plate over stiffener at joint of section 1 (base/unload section) and section 2
(burner/blower section).

Figure 10R

NOTE: Seal the upper bolts 5/16" with electrical tape. To avoid drop into the dryer while placing

stiffener splice.

3/8" Grill to venturi

5/16" Grill guard

3/8" Bolt

Burner/blower

5/16" Bolt

3/8" Bolt

Stiffener splice plate
(GT4-5074)

Advertising