Venturi, Stiffener splice, Lifting and stacking the modules – Grain Systems PNEG-1708 User Manual
Page 63
Advertising
![background image](/manuals/277624/63/background.png)
10. Lifting and Stacking the Modules
PNEG-1708 GSI Modular Tower Dryer
63
Venturi
Figure 10Q
Stiffener Splice
Place stiffener splice plate over stiffener at joint of section 1 (base/unload section) and section 2
(burner/blower section).
Figure 10R
NOTE: Seal the upper bolts 5/16" with electrical tape. To avoid drop into the dryer while placing
stiffener splice.
3/8" Grill to venturi
5/16" Grill guard
3/8" Bolt
Burner/blower
5/16" Bolt
3/8" Bolt
Stiffener splice plate
(GT4-5074)
Advertising