Flame sensor and ignitor wires (spark plug), Electrical connections – Grain Systems PNEG-1708 User Manual

Page 67

Advertising
background image

11. Electrical Connections

PNEG-1708 GSI Modular Tower Dryer

67

Flame Sensor and Ignitor Wires (Spark Plug)

1. From inside the burner/blower module, the flame rod wire and the spark plug wire will be passed

through these holes as shown in

Figure 11F

.

2. The flame sensor and ignitor wires connect to the electrical control box.

Figure 11E

Electrical control box

Holes through which flame sensor and
ignitor wires will be passed. See close
up in

Figure 11F on Page 68

.

Advertising