7. Placing and Installing the Base/Unload Module

32

PNEG-1708 GSI Modular Tower Dryer

Securing the Unload Module

1. After determining the orientation of the unload module, use a 1-1/8" drill bit at least 12" long to drill

holes for the anchor bolts.

NOTE: Anchor bolts are 1" in diameter but the hole for them must be 1-1/8" in diameter to allow for

the required epoxy.

NOTE: It may be necessary to loosen or remove the bolts on the X-braces to gain easier access to

the holes for the anchor bolts. If X-braces are removed or loosened to drill the anchor bolt
holes, be sure to tighten the X-braces again when done.

Figure 7D

2. Use a laser transit to level the unload module.

IMPORTANT: ALWAYS use the compression channel as the point of reference for establishing

the levelness of the unit. Never use the feet/anchor plates to determine levelness.

(See Figure 7E.)

Figure 7E

CAUTION

While it is normal to encounter rebar on occasion when drilling the holes for anchor
bolts, should this happen more than 3 or 4 times, it is necessary to contact GSI for
splice plates to complete the drilling of the anchor bolt holes.

(See Figure 7D.)