Grain Systems PNEG-1708 User Manual
Page 59
Advertising
10. Lifting and Stacking the Modules
PNEG-1708 GSI Modular Tower Dryer
59
8. On all models of the GSI Modular Tower Dryer, the first two (2) connecting seams - between the
base/unload module and Module 2 and between Module 2 and Module 3 - require a nut and bolt in
EVERY hole of the connecting channel, both INSIDE and OUTSIDE of the dryer.
Figure 10K
a. For all other connecting seam after/above the first two (2), every other hole may be bolted.
OUTSIDE of dryer: Two (2) connecting channels between two (2) modules.
NOTE: Every connecting hole must have a nut and bolt in place.
INSIDE of dryer: Two (2) connecting channels between two (2) modules.
Outside channels - Bolted every other hole
Inside channels - Bolted every hole
Advertising