10. Lifting and Stacking the Modules

52

PNEG-1708 GSI Modular Tower Dryer

The GSI Modular Tower Dryer is designed to maximize safety and minimize assembly time. All models
will be assembled in similar fashion by: Lifting the roof module, stacking it on to the dryer module to be
directly underneath it and connecting those modules together. Then, the conjoined modules are lifted and
stacked on the next highest dryer module and connecting the modules. In this way, the vast majority
of work will be completed no more than ten feet (10') off of the ground. See the following figures on

Pages 52-55

for the specific recommendations for each model of the GSI Modular Tower Dryer.

NOTE: In all instances, six feet (6') lifting straps are recommended.

Recommended Stacking Order: Model 800 Series Dryer

Figure 10A Model 800

S

tep

1:

S

tack and

co

nnect

R

o

of

to

Mod

u

le 4

S

tep

2:

S

tack a

nd

conn

ect Ro

of/4

to Module 3

S

tep

4:

S

tack a

nd

conn

ect

Roof/4/

3

/2

to

Base

Base

/Unloa

d

Thi

s sugge

sted se

quencin

g

plan m

aximizes sa

fety and

conven

ience,

by performing

most

work clos

e to the g

rou

nd.

IMPORT

AN

T

:

Make sure crane is of adeq

uate lif

ti

ng cap

a

ci

ty

.

T

he recommen

ded stra

p len

g

th

i

s

6'

lon

g

.

NOTE:

C

a

tw

alks,

ladde

rs an

d other accessorie

s

no

t show

n

for clar

it

y.

Be sure to inclu

de wei

ght

o

f accessori

es

w

hen

combin

ing modu

les.

St

e

p

3

:

S

tack and con

nect

Ro

of/4

/3

to Modu

le 2

NOTE:

If the crane is not sufficient

t

o

l

if

t

th

e co

mb

ine

d

w

e

igh

t of Roof/4/3/

2

as

shown,

repla

c

e

step

4

wi

th

con

necting

Mod

u

les

3

and

2

, st

a

c

ki

ng 3/2 on the base

an

d th

en pla

c

ing

Roof/4/3 on to

p of

Base

/2

.

Advertising