7. Placing and Installing the Base/Unload Module

PNEG-1708 GSI Modular Tower Dryer

33

NOTE: Shims are provided to assist with leveling if necessary.

(See Figure 7F.)

Figure 7F

3. After drilling the holes, all debris and fine material must be removed from the holes.

4. Use a compressed air hose to blow the dust and debris out. Then, drop anchor bolt in holes to confirm

depth is adequate.

5. Once the unit is level, fill anchor bolt holes approximately 1/2" full with the provided epoxy. Press

anchor bolts in holes.

(See Figure 7G.)

NOTE: Epoxy should ooze up and out of the hole at the base of the plate. If it does not, add epoxy

and repeat. No more than 2" to 3" of the bolt should remain above the plate.

(See Figure 7G.)

6. After all anchor bolt holes have been filled with epoxy and all anchor bolts have been inserted into

the holes to the proper depth, allow epoxy to set for 4 to 6 hours before installing and tightening nuts
or stacking another module of the dryer on top of it.

Figure 7G

CAUTION

Do NOT remove more than one set of X-braces on the base/unload module as doing
so may compromise the structural integrity of the dryer. One set may be removed to
accommodate auxiliary equipment.