Lifting – Grain Systems PNEG-1708 User Manual

Page 56

Advertising
background image

10. Lifting and Stacking the Modules

56

PNEG-1708 GSI Modular Tower Dryer

Lifting

1. Use four (4) clevis hooks to connect the crane’s lifting straps to the module.

2. Remember, all modules except the roof, lift from four (4) lift points around the outside of the unit.

NOTE: The recommended strap length for lifting is 6' long.

Figure 10E

Figure 10F

Advertising