3 commissioning, 1 scope of delivery, 2 power supply – Xylem HandyLab 600 User Manual

Page 11: 3 initial commissioning, Commissioning, Scope of delivery, Power supply, Initial commissioning, 3commissioning

Advertising
background image

HandyLab 600

Commissioning

ba77064e01

03/2014

11

3

Commissioning

3.1

Scope of delivery

Meter HandyLab 600

4 batteries 1.5 V Mignon type AA

USB cable (A plug on mini B plug)

Short instructions

CD-ROM with

– USB drivers
– detailed operating manual
– Software MultiLab Importer

3.2

Power supply

The HandyLab 600 is supplied with power in the following ways:

Battery operation (4 batteries, 1.5 V Mignon type AA)

USB operation via a connected USB-B cable

3.3

Initial commissioning

Perform the following activities:

Insert the supplied batteries

Switch on the meter (see
section 4.2 S

WITCHING

ON

THE

METER

, page 16)

Set the date and time (see
section 4.4.5 E

XAMPLE

2

ON

NAVIGATION

: S

ETTING

THE

DATE

AND

TIME

, page

20)