4 panel mounting, Panel mounting -29, Section 3.7.4) – YSI DIQ/S 182 XT-4 System 182 XT-4 User Manual

Page 43

Advertising
background image

System 182 XT-4

Installation

3 - 29

ba76026e01

01/2012

3.7.4

Panel mounting

Materials required

 PMS/IQ kit for panel mounting (see chapter 11 A

CCESSORIES

AND

OPTIONS

).

Tools

 3 mm set screw wrench (contained in the panel installation kit).

Switch panel aperture

Fig. 3-19 Mounting aperture in the switch panel (dimensions in mm)

Note
The space required on the panel for DIQ/S 182 XT-4 is given in the
dimension drawings in section 9.5.

Mounting the

DIQ/S 182 XT-4 in a

switch panel

138

138

34.5

47

11

11

4

Maximum thickness
3 mm

1

Unscrew the DIQ/CR3 combi output module from the DIQ/
S 182 Universal Transmitter.

2

Insert the DIQ/S 182 Universal Transmitter in the panel
aperture from the front.

Advertising