Commissioning

3.1

Scope of delivery

Meter MultiLab 4010-1 / MultiLab 4010P-1

4 batteries 1.5 V Mignon type AA

Power pack

USB cable (A plug on mini B plug)

Stand

Stand holder

Comprehensive operating manual

Short instructions

CD-ROM with

– USB drivers
– comprehensive operating manual
– software MultiLab User
– software MultiLab Importer

3.2

Power supply

The MultiLab 4010-1 is supplied with power in the following ways:

Mains operation with the supplied power pack

Battery operation (4 batteries, 1.5 V Mignon type AA)

USB operation via a connected USB-B cable

3.3

Initial commissioning

Perform the following activities:

Insert the supplied batteries

For mains operation: Connect the power pack

If necessary, mount the stand

Switch on the meter (see section 4.2 S

WITCHING

ON

THE

METER

, page 19)

Set the date and time (see section 4.5.5 E

XAMPLE

2

ON

NAVIGATION

: S

ETTING

THE

DATE

AND

TIME

, page 26)