Standard operations – Hach-Lange DR 3800 User Manual User Manual

Page 57

Advertising
background image

57

Standard Operations

Enter the Name
Check the working procedure in advance to determine whether this
point needs to be changed.

1. Highlight the line containing Name and press Edit. Use the

alphanumeric keypad to enter the name indicated in the
working procedure.

2. Press

OK

to confirm.

Enter the Version

1. Highlight the line containing Version and press Edit. Use the

alphanumeric keypad to enter the name indicated in the
working procedure.

2. Press OK to confirm.

Enter the Measurement Process
For detailed information on entering the measurement process, see

section 6.1.2 on page 76

.

Check the working procedure in advance to determine whether this
point needs to be changed.

1. Highlight the Measurement Process line in the data overview

and press Edit.

2. Press Edit, select the sequence to be edited and press Delete.

3. Press New and use the alphanumeric keypad to enter the

process indicated in the working procedure.

Timer 1, Timer 2,
Timer 3, Timer 4

This function can be used to enter abbreviations and defined times for up to four timers. Highlight
the appropriate line and press Edit.
The timers are activated or deactivated with the control boxes on the left of the display. In the
next column, a selection can be made from a list of names that describe the corresponding work
step. In the third column, the times for each active timer are entered.

Table 6 Program update options (continued)

Program point

Description

Advertising