1 unpacking and setting up your analyzer, Set up, Unpacking and setting up your analyzer – Nova-Tech PMB Moisture Analyzer User Manual

Page 7: 0 set

Advertising
background image

 

 

5

|

P a g e

© Adam Equipment Company 2009

3.0 SET

UP


3.1 UNPACKING

AND

SETTING

UP

YOUR

ANALYZER


Remove the analyzer from the packing by carefully lifting it out of the box.
Inside the box you will find everything needed to start using the analyzer-

9 AC power cable
9 Pan

Support

9 Stainless Steel Lower Chamber Insert
9 Sample Pan Lifter
9 Sample Pans (x10)
9 Spare Fuse, T5Amp
9 This User Manual

For PMB supplied from the USA only:

9 RS-232 Interface Cable for use with a PC
9 USB to PC cable
9 USB driver software on CD



IMPORTANT:
Before applying power the analyzer make sure the analyzer is configured for
the power in your area. The analyzer will have a label on the rear panel
showing the voltage required. 115VAC (±10%) or 230VAC (±10%). If the
label does not match your power do not attempt to use the analyzer, damage
to the analyzer could result.

Advertising