2 assembling the analyzer, Assembling the analyzer – Nova-Tech PMB Moisture Analyzer User Manual

Page 8

Advertising
background image

 

 

6

|

P a g e

© Adam Equipment Company 2009


3.2 ASSEMBLING

THE

ANALYZER

For best performance, let the analyzer warm up for 30 minutes before using.

z Locate the analyzer on a solid

surface, free from vibration with
good ventilation around it.


z Place the lower reflector (1) into

the base of the weighing
chamber


z Gently place the pan support

(2) into the access hole. Rotate
to position.


z Place the sample pan lifter (3)

into the weighing chamber,
rotate so the tangs on the lifter
do not interfere with the pan
supports and the handle exits
the chamber using one of the
gaps in the cover.


z Place an empty aluminium

weighing tray (4) on the pan
support


z Level the analyzer using the

adjustable feet and spirit level


For some applications it is desirable to run the analyzer in a dummy run to
warm up the weighing chamber and the surrounding area before doing the
actual test. See section 14 for other ideas to help ensure accurate test
results.

Advertising