Section 3: Pre-Installation

12/12

16

51193 Revision 5

3.3. UNPACKING








Follow these guidelines when unpacking all equipment.

Check in all components and accessories according to the customer's order.

Remove all components from their packing material, checking against the invoice

that they are accounted for and not damaged.

Advise the shipper immediately, if damage has occurred.
Keep the shipping container and packing material for future use.
Order any parts necessary to replace those which have been damaged.
Check the packing list.

The

CUSTOMER

is the

receiving party

if the equipment was

shipped to

the Customer’s address.

FAIRBANKS

is the

receiving party

if the equipment was

shipped to the

Fairbanks Service Center.

Collect all necessary installation manuals for the equipment and accessories.

Open the equipment and perform an inspection, making certain that all hardware,

electrical connections and printed circuit assemblies are secure.

Do not reinstall the cover if the final installation is to be performed after the pre-

installation checkout.

Do not load the platform if there is any evidence of damage to the platform or

supporting structure.

All beams and channels come in banded bundles.