Installing base plates, and locator tools – Fairbanks Tundra Series Truck Scale User Manual
Page 28
Section 4: Scale Installation
12/12
28
51193 Revision 5
4.5. INSTALLING BASE PLATES, AND LOCATOR TOOLS
1. Using the
Certified Drawing Specifications,
locate and mark the drill
holes into the smooth pier top for each Base Plate.
2. Use hydraulic jacks to lift the
weighbridge from the wooden blocks
and install the Locating Tool on top of
the Base Plate (where the load cells
will be located
).
3. When the weighbridge is set on all of
the Locating Tools, Re-inspect all
locating tools are properly aligned and
weighbridge is positioned correctly
within the pit.
4. Tighten all bolts on the weighbridge.
5. Use a hammer-drill to make
two (2)
5/8"
holes
into each .
6. Hammer the Base Plate Anchors into
clean holes and tighten the nuts
securely, being careful that threads
are not damaged.
─ Each base plate must be level and
in full contact with the top of the
pier.
─ Adjustments can be made by
chipping the concrete.
─ A maximum of +/- 1/8" space for
movement
is allowed.
─ Insert the two (2)
2-1/2” roll
pins
into each base plate for load
cell anti-rotation.