4.5. INSTALLING BASE PLATES, AND LOCATOR TOOLS

1. Using the

Certified Drawing Specifications,

locate and mark the drill

holes into the smooth pier top for each Base Plate.

2. Use hydraulic jacks to lift the

weighbridge from the wooden blocks

and install the Locating Tool on top of

the Base Plate (where the load cells
will be located

).

3. When the weighbridge is set on all of

the Locating Tools, Re-inspect all

locating tools are properly aligned and

weighbridge is positioned correctly

within the pit.

4. Tighten all bolts on the weighbridge.
5. Use a hammer-drill to make

two (2)

5/8"

holes

into each .

6. Hammer the Base Plate Anchors into

clean holes and tighten the nuts

securely, being careful that threads

are not damaged.
─ Each base plate must be level and

in full contact with the top of the

pier.

─ Adjustments can be made by

chipping the concrete.

─ A maximum of +/- 1/8" space for

movement

is allowed.

─ Insert the two (2)

2-1/2” roll

pins

into each base plate for load

cell anti-rotation.