Moving the assembled sections – Fairbanks Tundra Series Truck Scale User Manual
Page 27
Section 4: Scale Installation
12/12
27
51193 Revision 5
4.4. MOVING THE ASSEMBLED SECTIONS
1. With the crane, lift and lower the first
fully-assembled Weighbridge Section
into the end of the Pit.
─ Set down the section slowly onto the
wooden cribbing blocks.
2. Using the crane, lift and lower the
second fully assembled Section into the
Pit. Use hydraulic jacks also to lift the
assembly slightly and shift into proper
alignment.
3. Fasten these two main girder sections
together with the cross beams and
hardware, using the 3/4" drift pins to
assist in aligning the plate and girder
holes.
─ Secure each joint tightly
4. Continue placing, blocking, and
fastening the main girder sections until
all pieces are in position.
5. Once all the sections are installed,
ensure that the measurements and
elevations are correct according to the
Certified Drawing Specifications
.