Section 4: Scale Installation

12/12

24

51193 Revision 5

4.2. INSPECTING THE CONTRACTOR’S PIT CONSTRUCTION

Inspect the work site; including the pit, scale house, all poured concrete, approaches

and exits, anchor bolt placements, and all measurements against the

Certified

Drawing Specifications.

─ See Foundation Inspection Checklist in Appendix II of this manual.
─ Upon the removal of the forms and backfill, check for proper drainage.

o A slope away from the scale is mandatory.

4.3. WEIGHBRIDGE SECTION ASSEMBLY

Assemble each of the Weighbridge frame sections on a flat surface near the pit.
1. With a crane, lay out the two (2) Main Frame I-beams of the first section parallel

onto a flat surface near the pit.

2. Position the cross channel between the two Main Frame I-beams.
3. Coat bolts thoroughly with anti-seize, then fasten the Main Frame I-beams

together loosely.

4. Place the rest of the cross channels into their upper and lower position, bolting

them together loosely.

5. Cross square the top and ends of

the weighbridge assembly, then

snug all the bolts.

6. Continue with this method until all

the sections are completely

assembled outside the Pit.

7. If the scale is eleven feet (11') or

wider

, install the outriggers.

8. Assemble the Checking Bracket

Bumper Bolt to the End Girders

Each Module Assembly is extremely heavy.

Handle with great care to prevent injury.

Always let the crane do the lifting.

Use cross pieces and blocking to prevent steel tipping over.

C A U T I O N !