Concrete deck forming and pouring, continued – Fairbanks Tundra Series Truck Scale User Manual
Page 33
Advertising
Section 4: Scale Installation
12/12
33
51193 Revision 5
4.7. CONCRETE DECK FORMING AND POURING, CONTINUED
5.
After the concrete is fully cured
, remove the positioning spacers (5/8"
nuts
), cut the corrugated to open the manhole access, and remove the wood
support from the deck underside.
─ The scale deck and weighbridge will now freely float.
A T T E N T I O N
The scale
SHOULD NOT BE LOADED
for any purpose
until the core samples indicate that it is properly cured!
Advertising