Concrete deck forming and pouring, continued – Fairbanks Tundra Series Truck Scale User Manual

Page 33

Advertising
background image

Section 4: Scale Installation

12/12

33

51193 Revision 5

4.7. CONCRETE DECK FORMING AND POURING, CONTINUED


5.

After the concrete is fully cured

, remove the positioning spacers (5/8"

nuts

), cut the corrugated to open the manhole access, and remove the wood

support from the deck underside.
─ The scale deck and weighbridge will now freely float.

















A T T E N T I O N

The scale

SHOULD NOT BE LOADED

for any purpose

until the core samples indicate that it is properly cured!

Advertising