Ransburg, Vector solo 65kv applicator - maintenance – Ransburg Vector Solo 65KV 79965 Solventborne RS70-AS User Manual

Page 41

Advertising
background image

Vector Solo 65kV Applicator - Maintenance

37

AH-08-02.6

Figure 65: Remove Power Module from Handle

6

1

L H

5

Figure 66: Connect Barb and Tubing to

Tee Fitting

3. Connect the left-hand fitting of the 79727 Air

Hose to the male inlet of the Test and Maintenance

Kit.

4. Insert the tubing [6] into the smaller diameter

hole in the top of the air fitting in the power module.

Figure 67: Connect Tubing to the Air Fitting

6

TP-1

TP-2

Figure 68: Connect the PC Board to a Digital

Multi-Meter and True Earth Ground

5. Connect a wire from test point 2 (on the PC

board in the power module) to a true earth ground.

6. Connect a digital multi-meter to test points 1

and 2.

TP-1-Test Point #1

TP-2-Test Point #2

Ground-True Earth

The procedure to test the 79835 Power Module

Assembly is as follows:

1. Remove the 79835 Power Module Assembly

from the handle.

2. Connect the barb fitting [5] to the brass tee

fitting [1]. Place the tubing [6] on the end of the

barb fitting.

Ransburg

Advertising