Ransburg, Air hose maintenance – Ransburg Vector Solo 65KV 79965 Solventborne RS70-AS User Manual

Page 42

Advertising
background image

Vector Solo 65kV Applicator - Maintenance

38

AH-08-02.6

7. Connect the 79727 Air Hose to main air.

8. Turn on main air and set the pressure so the

pressure gauge [2] in the 79870 Test and Main-

tenance Kit reads 25 psi (1.7 bar). The voltage

kV setpoint lever should be in the high voltage

position (down). The digital multi-meter should

read approximately 15 VDC.

Figure 69: Set Pressure Gauge to

1.7 BAR(25 psig)

9. If the voltage is outside this range, there is a

problem with the power module circuitry. If the

voltage range is acceptable the power module is

operating correctly, and there is an issue with either

the cascade or the wire connections leading to it.

AIR HOSE

MAINTENANCE

Air Hose - Ground Wire End

1. Cut the end of the air hose so that end is square.

2. Slide the sleeve and compression ring onto the

air hose end.

Figure 70: Sleeve and Compression Ring

3. Push the stem of the fitting all the way into the

into the air hose.

4. Slide the compression ring and the sleeve into

the fitting body and tighten.

Air Hose - Applicator End

1. Cut the end of the air hose so that end is square.

2.Install the 79930 fitting (std) or 79868 (qd)

into the hose end. Lightly lubricate the barb end

of the fitting with LSCH-0009 di-electric lubri-

cant. Push the fitting into the air hose up to the
threads on the stem.

Figure 71: Ground Fitting Insertion

Figure 72: Sleeve Tightening

Figure 73: Fitting Insertion

Ransburg

Advertising