Preparation, Site preparation – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual
Page 12
Advertising

10
PREPARATION
SITE PREPARATION
Check the national and local building codes BEFORE installation.
GATE
CONDUIT & CONCRETE PAD
Gate must be constructed and installed according to ASTM F2200 standards (refer
to page 4). Gate must fit specifications of operator (refer to specifications).
Conduit must be UL approved for low and high voltage. Consider the operator
placement BEFORE installing the pad or post.
Concrete Pads
Advertising