Wiring – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual

Page 27

Advertising
background image

25

DUAL GATES ONLY CONTINUED...

2

1

3

4

Before digging, contact local underground utility locating companies. Use PVC conduit to prevent damage to cables.
Disconnect ALL power to the operator and unplug the J15 plug from

the control board.

1

Trench across driveway to bury the extension cable.

2

Connect the wires from the extension cable to the Comm Link terminals on

the primary gate operator control board. NOTE: We recommend that all

accessories and board configurations are set on the primary operator.

3

Route the extension cable to the secondary gate operator's control board.

4

Connect the wires from the extension cable to the Comm Link terminals on

the secondary control board (Comm Link A to Comm Link A and Comm

Link B to Comm Link B).

Connect ALL power to the operator and plug the J15 plug into the

control board.

Comm Link Data A

Comm Link Data B

Comm Link Data A

Comm Link Data B

WIRED DUAL GATES

DUAL GATE WIRE TYPE (SHIELDED TWISTED PAIR CABLE)

22AWG up to 200 feet (61 m)

18AWG - 200-1000 feet

(61-305 m)

Wire must be rated at 30 Volt minimum

DUAL GATES ONLY

WIRING

BIPART DELAY/SYNCHRONIZED CLOSE

The LOCK/BIPART DELAY switch is used only with dual gate applications and

serves two functions:
BIPART DELAY
SWING GATE APPLICATIONS: The BIPART DELAY is used in applications

where a mag-lock, solenoid lock, or decorative overlay would require one

gate to close before the other. The operator with the LOCK/BIPART DELAY

switch ON will delay from the close limit when opening and be the first to

close from the open limit.

SLIDE GATE APPLICATIONS: Not applicable, set to OFF.

SYNCHRONIZED CLOSE
The BIPART DELAY is also used in applications where one gate travels a

longer distance than the other. To synchronize the closing of the gates, set

the LOCK/BIPART DELAY switch to ON for both operators.

Advertising