Connect batteries, Wiring – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual

Page 24

Advertising
background image

22

J15 Plug

Jumper

Black Wire

Red Wire

The batteries are charged in the circuit by the integrated transformer. The batteries

are for battery backup.

1

Turn OFF AC power to the operator.

2

Unplug the J15 plug labeled BATT on the control board by squeezing the plug

and pulling it from the control board. This disconnects the ac/dc power to the

the control board.

3

Connect a jumper between the positive (+) terminal of one battery to the

negative terminal (-) of the other battery.

4

Connect the red wire from the J15 plug to the positive (+) terminal of the

battery.

5

Connect the black wire from the J15 plug to the negative (-) terminal of the

battery.

6

Plug the J15 plug back into the control board. This will power up the control

board. NOTE: You may see a small spark when plugging the J15 plug into the

board.

7

Turn ON AC power to the operator.

8

Turn ON the AC power switch on the operator.

7AH BATTERIES

CONNECT BATTERIES

AC POWER SWITCH + CONNECT BATTERIES

WIRING

AC POWER SWITCH

The AC Power switch on the operator will turn the incoming 120/240 Vac power ON

or OFF. The operator's AC Power switch ONLY turns off AC power to the control board

and DOES NOT turn off battery power.

AC Power Switch

Advertising