Compact installation only, Installation – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual

Page 18

Advertising
background image

16

INSTALLATION

COMPACT INSTALLATION ONLY

COMPACT INSTALLATION ONLY

DETERMINE LOCATION FOR CONCRETE PAD AND

OPERATOR

DO NOT run the operator until instructed.
Refer to the illustration to determine the measurements and location of the

concrete pad.
NOTE: When lifting the operator use the handle to avoid damaging the operator.

TOP VIEW OF OPERATOR AND GATE

Gate Open 90°

Gate Hinge Center

26-1/2”

9”

Output Shaft Center

28”

24”

Handle

CONCRETE PAD AND OPERATOR ATTACHMENT

Check the national and local building codes before installation.

1

Install the electrical conduit.

2

Pour a concrete pad (reinforced concrete is recommended). The concrete pad

should be 6 inches above the ground and deeper than the frost line. Ensure

the pad is tall enough to avoid possible flooding.

3

Secure the operator to the concrete pad with appropriate fasteners.

NOTE: An alternative to a concrete pad is to post mount the operator (refer to

accessories).

4 Concrete Anchors

1/2” x 3 1/2”

Below the frost line.

Check all national

and local codes.

6” Above Ground

28”

1

2

3

Post Mount

24”

CONDUIT LOCATION

MOUNTING FOOTPRINT

5.5”

4.5” 1”

6.5” 4”

1.5”

10”

3”

28”

20”

15”

24”

13.6”
12.2”

6.1”

2.49”

14”

14.82”

(cover mounting distance)

(Conduit)

(Pad)

24”-32"