Installation, Standard installation only continued – LiftMaster CSW24V High-Cycle Commercial DC Swing Gate Operator User Manual

Page 16

Advertising
background image

14

STANDARD INSTALLATION ONLY

CONTINUED...

CONCRETE PAD AND OPERATOR ATTACHMENT

Check the national and local building codes before installation. NOTE: When lifting

the operator use the handle to avoid damaging the operator.

1

Install the electrical conduit.

2

Pour a concrete pad (reinforced concrete is recommended). The concrete pad

should be 6 inches above the ground and deeper than the frost line. Ensure the

pad is tall enough to avoid possible flooding.

3

Secure the operator to the concrete pad with appropriate fasteners.

NOTE: An alternative to a concrete pad is to post mount the operator (refer to

accessories).

4 Concrete Anchors

1/2” x 3 1/2”

Below the frost line.

Check all national

and local codes.

6” Above Ground

28”

24”

1

2

3

Post Mount

INSTALLATION

STANDARD INSTALLATION ONLY

CONDUIT LOCATION

MOUNTING FOOTPRINT

5.5”

4.5” 1”

6.5” 4”

1.5”

10”

3”

28”

20”

15”

24”

13.6”
12.2”

6.1”

2.49”

14”

14.82”

(cover mounting distance)

(Conduit)

(Pad)

Advertising