IEI Integration RPC-6010G User Manual

Page 51

Advertising
background image

RPC-6010G Rackmount LCD Workstation

NOTE:

This section gives a generic description of the rack mounting process for the

RPC-6010G rackmount workstation. Alternate rack mounting systems may

require different mounting procedures. Be sure to follow the manufacturer’s

instructions when mounting the workstation.

To rack mount the workstation, please follow the steps below.

Step 1:

The left and right side panels of the workstation each have four screw holes for

rack handle bracket installation. Assemble the rack handle brackets and secure

them to the workstation. (See Figure 4-16)

Figure 4-16: Rack Handle Bracket Assembly and Installation

Page 41

Advertising