Configuration jumpers – 2N StarGate/BlueTower v5.3 User Manual

Page 35

Advertising
background image

35

2N TELEKOMUNIKACE a.s., www.2n.cz

®

3.  

4.  

5.  

6.  

Flashing: B–channel in restartLight off: No active call

Status of ISDN layer 2 on PRI 1 (2) interfaces:

Shining: Layer 2 successfully established
Flashing: Layer 2 in the establishing process
Light off: Layer 2 disconnected

Status of ISDN layer 1 on PRI 1 (2) interfaces:

Shining: Layer 1 successfully established
Flashing: Layer 1 in the establishing process
Light off: Layer 1 disconnected

Physical RJ45 connectors for ISDN PRI 1 and PRI 2 interfaces. Before you plug in
your ISDN connection please check whether the wiring configuration matches the
ISDN connection requirements!

Tip

The  LED  statuses  provide  basic  information  on  the  ISDN
interface  only.  For  details  on  the  ISDN  interface  state  refer  to
the web interface.

Configuration Jumpers

Advertising