4 installation, Product completeness check, Installation conditions – 2N StarGate/BlueTower v5.3 User Manual
Page 49

49
2.4 Installation
Product Completeness Check
Before installing this product, check whether the delivery is complete according to the
following packing list and read this manual thoroughly. The manufacturer cannot be
held responsible for any damage incurred due to an incorrect use of this product in
contradiction with this manual. The warranty terms do not cover damage to the
product caused by rough handling, incorrect storage or exceeding the quoted technical
parameters.
Item
Rack with AC power
supply
Rack with DC power
supply
Power cable 2.5m
1
–
Mounting set
1
1
Software CD
1
1
Twisted cable for
headset
1
1
Headset for test calls
1
1
Serial 9F–9F cable
1
1
Table: Basic Packing List Items
Included device
1PRI
card
2PRI
card
VoIP
card
Basic CPU
card
Enhanced CPU
card
Ethernet cable
3m
1
2
1
Ethernet cable
0.6m
1
2
Table: Additional Packing List Items
Tip
The packing lists are the same for all the gateway types (2N
®
).
StarGate/ BlueTower
Installation Conditions
The following conditions must be met during system installation:
Appropriate location (enough free space).