4 installation, Product completeness check, Installation conditions – 2N StarGate/BlueTower v5.3 User Manual

Page 49

Advertising
background image

49

2N TELEKOMUNIKACE a.s., www.2n.cz

®

2.4 Installation

Product Completeness Check

Before installing this product, check whether the delivery is complete according to the
following  packing  list  and  read  this  manual  thoroughly.  The  manufacturer  cannot  be
held  responsible  for  any  damage  incurred  due  to  an  incorrect  use  of  this  product  in
contradiction  with  this  manual.  The  warranty  terms  do  not  cover  damage  to  the
product caused by rough handling, incorrect storage or exceeding the quoted technical
parameters.

Item

Rack with AC power
supply

Rack with DC power
supply

Power cable 2.5m

1

Mounting set

1

1

Software CD

1

1

Twisted cable for
headset

1

1

Headset for test calls

1

1

Serial 9F–9F cable

1

1

Table: Basic Packing List Items

Included device

1PRI
card

2PRI
card

VoIP
card

Basic CPU
card

Enhanced CPU
card

Ethernet cable
3m

1

2

1

 

 

Ethernet cable
0.6m

 

 

 

1

2

Table: Additional Packing List Items

Tip

The  packing  lists  are  the  same  for  all  the  gateway  types  (2N

®

).

StarGate/ BlueTower

Installation Conditions

The following conditions must be met during system installation:

Appropriate location (enough free space).

Advertising