5installation – Lenze E94AYCDN User Manual

Page 23

Advertising
background image

Lenze · E94AYCDN communication module (DeviceNet™) · Communication Manual · DMS 5.0 EN · 02/2014 · TD17

23

5

Installation

5.2

Electrical installation

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

[5-3]

DeviceNet line

E94YCDN008

D1 ... n: Devices 1 ... n

S: scanner (e.g. PLC, IPC)

Note!

• Connect a bus terminating resistor of 120  each to the first and the last node of the

DeviceNet line.

• Connect the shield at the voltage supply together with the "V-" connection to GND

once. For this purpose, use the centre point of the DeviceNet line, if possible.

• Connect the shield of the DeviceNet cable for each node only to the SHIELD

connection of the plug connector.

Advertising