2 preparing the commissioning procedure, Preparing the commissioning procedure, Final works – Lenze EVF9383 User Manual

Page 110

Advertising
background image

Final works

Preparing the commissioning procedure

6

l

110

EDKVF9383 DE/EN/FR 4.0

6.2

Preparing the commissioning procedure

For commissioning with a keypad you require:

ƒ

An EMZ9371BCkeypad

For commissioning with a PC you require:

ƒ

A computer with a Windows® XP operating system

ƒ

The Lenze PC software »Global Drive Control (GDC)«

ƒ

A connection to the controller via an interface:

Controller

Connection

PC

Interface

PC adapter

Interface

Integrated system bus or
a CANopen EMF2175IB
communication module

System bus cable (is
enclosed with the
system bus
adapters)

EMF2173IB system bus adapter

Parallel

EMF2177IBsystem bus adapter

USB

EMF2102IBCV001 LECOM-A/B
communication module

Serial cable
EWL0020
EWL0021

For LECOM−B the following is
required:

l

A standard RS232/RS485
converter

l

A RS485 connection cable

Serial (RS232)

EMF2102IBCV003
LECOM−LIcommunication module

Optical fibre
EWZ0006
EWZ0007

Optical fibre adapter
EMF2125IB
EMF2126IB

Furthermore you require:

ƒ

The system manual for the controller used

ƒ

If required, the communication manual (KHB) for the network of the automation
platform

ƒ

Mains voltage or 24 V voltage supply for the control electronics of the controller

Follow the instructions of the software and/or read the documentation.

Advertising
This manual is related to the following products: