MK Diamond MK-101Pro24 JCS User Manual

Page 32

Advertising
background image

32

MK-101 Pro24 JCS MAINTENANCE

Perform the following after initial purchase and operation of the MK-101.

(A)

Check and adjust V-belt

tension following first 48 hours of

operation (See V-belt Inspection).

(A)

Lubricate the Guide Bar.

(B)

Lubricate the Roller

Wheel Assembly.

Ensure the saw is off and disconnected before performing any maintenance.

CAUTION

NEW MAINTENANCE

Maintenance Following Use

To extend the life of the MK-101 Pro24, the following procedure should be performed after each use.

Lubricate all points listed below with light oils such as, 3 in 1, WD-40, etc.

Advertising