MK Diamond MK-101Pro24 JCS User Manual
Page 32
Advertising
32
MK-101 Pro24 JCS MAINTENANCE
Perform the following after initial purchase and operation of the MK-101.
(A)
Check and adjust V-belt
tension following first 48 hours of
operation (See V-belt Inspection).
(A)
Lubricate the Guide Bar.
(B)
Lubricate the Roller
Wheel Assembly.
Ensure the saw is off and disconnected before performing any maintenance.
CAUTION
NEW MAINTENANCE
Maintenance Following Use
To extend the life of the MK-101 Pro24, the following procedure should be performed after each use.
Lubricate all points listed below with light oils such as, 3 in 1, WD-40, etc.
Advertising