MK Diamond MK-101Pro24 JCS User Manual

Page 36

Advertising
background image

36

The MK-101 is designed with a power transmission belt. In order to ensure the MK-101 operates at peak

efficiency, the belt should be inspected monthly, and changed if the belt shows damage and/or excessive

wear.

(A)

Remove the Diamond Blade.

(B)

Remove the Cutting Head (See

Adjusting the Cutting Head).

(C)

Remove the Belt Guard. Loosen

the two top bolts.

(E)

Inspect the belt for cracks,

fraying, separation and wear.

Go to step H if replacement

required.

(D)

Remove belt guard

bottom bolt.

(F)

Check the belt for proper

tension if tension is correct, go

to step R (proper tension

1/8-inch).

(G)

Loosen the motor mounting

bolts, if re-tensioning only go

to step N.

(H)

Loosen the Motor Adjustment

Strap.

MK-101 Pro24 JCS MAINTENANCE

1. When a new belt is installed, it should be inspected and re-tensioned after the first

forty-eight (48) hours of operation.

NOTE:

Belt Inspection, Adjustment and Replacement

(I)

Push the motor toward the

front of the Cutting Head to

loosen the belt.

Advertising