RKI Instruments SDM-E2 User Manual

Page 53

Advertising
background image

Bump Testing an Instrument with Special Sensors • 48

e. Once the GAS 2 calibration gas has been applied for the

appropriate amount of time, the SDM-E2 will determine if the sixth
channel passed the bump test and will indicate a P (pass) or an F
(fail) to the right of the “B” which indicates it is a bump test result.

f.

The BUMP

T

LED will continue to flash amber while the docking

station performs a fresh air purge for the time defined by the AIR
TIME bump test parameter. After the purge is complete, if all
channels passed the bump test, the BUMP

T

LED will turn solid

green. If any channels failed the bump test, the BUMP

T

LED will

turn solid red.

g. Continue to step 18.

17. When the AUTO CAL bump test parameter is set to ON:

If all standard 4 channels pass the bump test:

a. The following screen appears indicating all standard 4 channels

passed the bump test and a bump test will begin on the fifth
channel.

CH4 48%LEL BP

OXY 12.0vol% BP

H2S 3.0ppm BF

CO 47ppm BP

CO2 4500ppm BP

NH3 3.0ppm BF

CH4 48%LEL BP

OXY 12.0vol% BP

H2S 23.0ppm BP

CO 47ppm BP

CO2 3500ppm B

NH3 ---------

Advertising