Installing a backup system chapter 2 – Rockwell Automation 1775-MX_S4A,D17756.3.1 User Manual PLC-3 BACKUP CONC(OR.DU1 User Manual

Page 18

Advertising
background image

Installing a Backup System

Chapter 2

2-3

Figure 2.1

Connections for a PLCĆ3 Backup System Using Scanner Backup

To Earth

Ground

Blue

Shield

Clear

To other

I/O Chassis

in the Channel

1

2

9

2

12

8

5

7

10

11

5

13

2

3

3

4

4

6

6

7

7

7

8

1. PLC-3 Processor (Primary)

2. Power Supply (cat. no. 1775-P1)

3. 1771 I/O Chassis (cat. no. 1771-A1B, -A2B, A3B, -A4B)

4. Power Supply (cat. no. 1771-P2)

5. Processor Chassis Power Cable, 6ft. (cat. no. 1775-CAP)

6. I/O Power Cable, 1ft. (cat. no. 1771-CE)

7. Twinaxial Cable (cat. no. 1770-CD) 10,000 ft. Max. Each I/O Channel at 57.6K Baud

8. Terminator (cat. no. 1770-XT) Connect one at each end of the I/O Channel

9. PLC-3 Processor (backup)

10. Backup Cable (cat. no. 1775-CBA, -CBB)

11. Backup Communication Cable (cat.no. 1770-CD)

12. Ground Bus Plate

13. Connection between Power Supply System Common studs

10391

Advertising