Installing a Backup System

Chapter 2

2-8

Setting Switch 2

The processor restart lockout switch (switch 2) must be ON so the backup
processor is capable of restarting the I/O chassis at switchover, if
necessary. If the system has more than one I/O chassis, switch 2 must be
ON in each chassis. For more detailed information about the processor
restart lockout feature, refer to the PLC-3 Programmable Controller
Installation and Operations Manual (publication 1775-6.7.1).

Setting Switch 8

The chassis I/O to backup processor switch (switch 8) must be ON so the
backup processor can receive inputs from the I/O chassis. The backup
processor will not be able to receive inputs from the I/O chassis if switch 8
is set incorrectly.

CAUTION: To guard against damage to equipment, make sure
that switch 8 on a 1771-A1B I/O chassis with starting module
group 0 is set to ON. If this switch is not ON, the backup
processor will not receive inputs from the I/O chassis.

You set up and install scanner modules whether you are configuring a
system for scanner backup or MX backup. The only difference is the cable
used between the backup connectors on the various modules.

To configure a scanner module you must:

set backup switches
select a backup cable
connect the backup cable
connect I/O channel wiring.

Setting Backup Switches

Each scanner module has four switches for selecting a switchover method
or stand-alone mode. Figure 2.5 and Figure 2.7 show the location of these
switches for the various scanner modules.

To select the backup mode, do the following:

1. Set backup switches 1 through 4 on the number one scanner module

(thumbwheel set to 1) in both primary and backup processors for the
type of switchover desired. See Table 2.A for 1775-S4A and 1775-SR
scanners or Table 2.B for 1775-S5 and 1775-SR5 scanners.