Chapter 4 Installing and Removing Plug-in Units

The control station can be hung on the front of the unit by using square
holes adjacent to the top unit latch.

c. Swing the door to near closed position.
d. Lift the door outward to remove.

5.

Disengage the captive latches at the front of the unit, one at the top and
one at the bottom of the unit.

Units that are 2.0 space factor and larger have two latches at the top. All
units with the 100 ms arc-resistant rating have two latches at the top.

6.

Detach the front portion of the pull-apart terminal blocks from the unit
base and place the wires and terminal blocks in line with the wiring
clearance tunnel.

Wiring
Tunnel