Rockwell Automation 6012DB PowerFlex Medium Voltage Variable Frequency Drive User Manual
Page 115
Advertising

Rockwell Automation Publication 6000-UM001B-EN-P - October 2014
115
Preventative Maintenance and Component Replacement
Chapter 5
3.
Loosen the top and bottom screws and remove the wires on the circuit
breaker.
Figure 51 - Screw location on Circuit Breaker
4.
Release the spring-loaded latches at the bottom of the circuit breaker and
lift the circuit breaker off the DIN rail.
Figure 52 - Release spring-loaded latch on LV Circuit Breakers
5.
Install the new circuit breaker in reverse order of removal.
Circuit Breaker Switch must
be in the Off position
Loosen screws and
remove wires
Loosen screws and
remove wires
Advertising
This manual is related to the following products: