Calibrate the cutting blades – Rockwell Automation 1786-series ControlNet Coax Media Planning and Installation Guide User Manual

Page 50

Advertising
background image

50

Publication CNET-IN002B-EN-P - June 2010

Chapter 3 Install a ControlNet Coax Media System

Calibrate the Cutting
Blades

Follow these procedure to calibrate your cable strip tool to cut FEP
or PVC cable.

1.

Turn the three screws outward to back the blades out to prevent the
calibration tool from bottoming out.

2.

Place the calibration tool into the cable strip tool, with the narrow end
installed and facing forward for FEP cable, and use the wider end
for PVC cable.

3.

Turn the adjusting screw:

clockwise to increase the cut depth.

counterclockwise to decrease the cut depth.

4.

Tighten the chamber gauge ring so that the calibration tool is locked in
place, closing all the way to the chamber gauge stop.

ATTENTION

Be sure to perform the calibration procedure the first time you
use the tool and every time you change the blade for both
memory cartridges. Due to slight differences between coax
cables, calibration should be performed when changing:

part numbers.

one cable manufacturer to another manufacturer.

Calibration Tool

Adjusting Screw

20088-M

FEP

/CL

2P

PV

C/C

L2

IMPORTANT

When aligned properly, the grooves of the calibration tool
should align with the blades.

Advertising