Chapter 3 Install a ControlNet Coax Media System
10.
Follow these guidelines when heating the tubing.
a. Place the tubing against the shoulder of the TNC connector.
b. Allow the heat gun to come to a temperature between
10…160
o
C (230…320
o
F).
c. Hold the cable assembly approximately 50 mm (2 in.) away from the
heat exhaust area of the heat gun while shrinking the tubing.
d. Continuously rotate the cable assembly around the heat exhaust area
of the heat gun. The entire process should take about four minutes.
e. Inspect the heat-shrink tubing to ensure that there are no voids
where the glue has incompletely melted, noting that voids could
cause a loss of the IP67 rating.
The tubing uses a heat-activated glue to help seal around the cable
and connector body. Some glue may be visible after the heating
process. Caution as this glue is hot.
Place the tubing against
the shoulder of the TNC
connector
Ensure that there are no
voids where glue has
incompletely melted
Shoulder of
TNC Connector
Total Length of Heat Shrink Tubing
31297-M