6 subwindow run, 1 run - general, 2 run test – Metrohm tiamo 2.3 Manual User Manual

Page 144: Subwindow run, Run - general, Run test, Perform run test

Advertising
background image

3.6 Subwindow Run

■■■■■■■■■■■■■■■■■■■■■■

128

■■■■■■■■

tiamo 2.3

3.6

Subwindow Run

3.6.1

Run - General

Subwindow: Workplace

Subwindow Run
The subwindow Run contains the operating elements for controlling
method sequences and for administering sample data. It is always dis-
played in the program part Workplace, i.e. it can not be removed from
the Workplace display. The subwindow can be enlarged and reduced as
required; it can also be maximized.

Tabs
The subwindow Run is comprised of the following three tabs:

Single determination
Control of single determinations.

Determination series
Control of determination series.

Note

If a run has been started on the tab Single determination (Status =
BUSY), then the tab Determination series is no longer accessible
(disabled). The same holds true for the tab Single determination in
the event that a run has started on the tab Determination series.

3.6.2

Run test

Menu item: Workplace

Tools Run test

Note

In contrast to the Sample table test, which is only used to check
whether or not all sample data is correct, the Run test also checks the
required hardware.

Single determination
The menu item Tools

Run test or the symbol is used to perform

the start test for the selected method. The precondition for this is that the
workplace is in READY status.

For the Run test, the dialog window Run test - 'Workplace name' -
Single determination
opens, in which information concerning the test is
displayed.

Advertising